Pingbian landfill, the total laying area of geomembrane at this site is 20,000 square meters. The thickness of the geomembrane used is 2.0mm, with length and width of 50 meters × 6 meters. The geotextile used is 400g filament geotextile. The total time from excavation to construction for the entire site is about 4 months, of which the total time for geomembrane laying is 25 days. Person...
Learn more
This construction site is in Yanshan County, Wenshan Prefecture, Yunnan Province. Party A is an agricultural planting company, mainly planting blueberries. The planting area of the entire park is about 1,000 mu. There are 3 reservoirs built in total, with a total water storage capacity of about 30,000 cubic meters. The membrane material used is 1.5mm thick HDPE membrane material, and th...
Learn more
This construction site is in Baoshan, using 2.0 thick HDPE geomembrane. The total laying area of this site is 6,000 square meters, with a water storage capacity of about 2,000 cubic meters. This site belongs to a relatively high-specification planting base. From the beginning of site excavation, it has entered the docking stage. During site excavation, we also gave some reasonabl...
Learn more
For mining areas, the construction of geomembrane is relatively strict. From sampling inspection when materials first enter the factory, to weld inspection, then to air tightness inspection, no matter what link there is a series of strict requirements. The construction site this time is located in Matang Industrial Park, Wenshan Prefecture, Yunnan Province. It is a mining company's...
Learn more
The construction address is located in Xinping County, Yuxi, Yunnan. This county has hundreds of thousands of mu of sugar orange planting bases. For sugar oranges, water is a very important planting condition. For areas without much water source, the only way is to build reservoirs to preserve water resources. And composite geomembrane has also been well applied locally. Almost as long as it i...
Learn more
The total construction area of composite geomembrane for this reservoir in Jianshui, Honghe, Yunnan is 800 square meters. The material used is 1000g composite geomembrane, and the membrane material used is two-cloth one-membrane. The total construction time is 1 day. The site is located by the road, so it is relatively convenient for the handling of membrane materials. The power source ...
Learn more
The Mengding Wogan planting area in Lincang selected two-cloth one-membrane, 1000g thickness composite geomembrane. The total usage area is 2,200 square meters, and the construction period is 5 days. The total time from delivery to construction completion is about 10 days. This is because Mengding is a border town in Yunnan. It takes about 2 days to ship logistics from Kunming, plus tra...
Learn more
Most of our common geomembrane construction is an overall pool that canplay its role. For chemical plants, this cannot meet their usage needs. Just like our tap water treatment plant, sewage needs to remove impurities, which requires a filter pool. After removing impurities, purifying sewage into reclaimed water is another process, which also requires a filter pool. Then converting reclaimed w...
Learn more
The quantity of extruded boards purchased by the customer this time is 108 cubic meters, with a thickness of 5cm. Extruded boards are mainly used for roof thermal insulation. The construction site is located in Manong area, Jinghong City.
Learn more
The supply location this time is the central gasification station in Panzhihua, Sichuan, mainly used for the roof of the oil depot. According to design requirements, B1 grade flame-retardant extruded polystyrene boards are used. The total supply took 2 days, and relevant quotation and testing basis are provided.