The total construction area of composite geomembrane for this reservoir in Jianshui, Honghe, Yunnan is 800 square meters. The material used is 1000g composite geomembrane, and the membrane material used is two-cloth one-membrane. The total construction time is 1 day. The site is located by the road, so it is relatively convenient for the handling of membrane materials. The power source used is a 3000W gasoline generator, with 5 auxiliary construction personnel provided by the customer and 1 construction welding personnel provided by our company for construction.
This pool is relatively regular in terms of excavation. The size and depth of the entire pool are excavated according to site conditions. There is less crushed stone in the pool, and after some treatment, the geomembrane was laid.

" />