This construction site is in Baoshan, using 2.0 thick HDPE geomembrane. The total laying area of this site is 6,000 square meters, with a water storage capacity of about 2,000 cubic meters.
This site belongs to a relatively high-specification planting base. From the beginning of site excavation, it has entered the docking stage. During site excavation, we also gave some reasonable suggestions, thereby making both excavation and laying proceed smoothly.
During site laying, there were 8 auxiliary staff and 2 welding personnel. The equipment used was climbing welding machines and extrusion welding machines. The total time for the site was 4 days. This is because the site is relatively flat with no places to climb, therefore, the construction speed was greatly improved.

" />