Use of Mengzi Geomembrane in Artificial Lakes

Geomembrane construction artificial lake

As an indispensable landscape element for urban development, artificial lakes bring a fresh and comfortable living environment to the entire city. Moreover, cities will also bring more garden atmosphere due to the construction of artificial lakes. The construction of artificial lakes, in addition to naturally formed expansion and reconstruction, there are also residential areas and parks that need to be artificially constructed. For some residential areas, its construction location may be on a hillside, which will have a greater impact on the water storage of the artificial lake, because mountainous areas can hardly store water.

After the artificial lake is excavated, the entire lake bottom site needs to be cleaned, and then the anti-seepage layer is made. For small areas, and without backfill soil or no surface layer process, we can use polypropylene for bathroom waterproofing at home for anti-seepage treatment. Because from the appearance, the advantage of this treatment is that the surface color can be adjusted according to the site situation. For example, if the overall tone is suitable for blue, then we can use blue as the surface layer to make it more coordinated with the surrounding environment. And if geomembrane is used for construction, then geomembrane only has two colors, one black and one white. But no matter which one, we need to carry out plain soil backfill during construction, or apply a layer of mortar on the surface.

Geomembrane is suitable for larger area artificial lakes or landscape lakes, and its construction speed is particularly fast. Almost 2000 square meters of construction per day can be completed within 1 day. Of course, the prerequisite here is that there are no landscape obstacles in the artificial lake being laid. That is to say, after the excavation of the artificial lake, the first thing is to lay the geomembrane. Then, if landscaping is done on the artificial lake surface, there is already the protection of backfill soil, which will not damage the membrane material.